1. Concrete curing time of base plate reach the specification requirements.
2. Base plate is thickness, clean, tidy and no greasy dirt.
3. Before construction the substrate must be wet fully and then dry to no-ponding.
1. Insure that the substrate is smooth, thickness, no-greasy dirt and no-dust and other waste. The dry substrate needs to be wet and dry to no-ponding.
2. Put the powder in container with water, and use electric mixer to stir until paste evenness. A few minutes later, stir well and use it.
3. Mixture water proportion: paint and brush: per 25kg
4. Paint and brush the coating on the substrate two layers with hairbrush and robber roller. General condition, after the first layer has dried 3-4 hours, it can brush the second layer.
5. The second layer should be brushed intersecting direction with the first layer. After coating is dry, it can be subsequent construction.
1. Allocated well PMC-101 needn’t stir again, and it should not be too much and be finished within 20 minutes.
2. Don't use this coating under 5 ℃.
3. The material isn’t a decorative material, if need to drive or walk on the coating, it need to add protective layer.
4. The upper of this material waterproof layer do not use lime mortar.
5. Wait for 7 days after coating layer harden if need to brush water- base decoration coating on PMC-101, and 20 days for solvent-base coating (epoxy and polyester coating). It is recommended to clean up substrates with 5% hydrochloric acid solution before construction, wash by clean water next, and then brush coating until dry for several days.